PRE-DISBURSEMENT INSURANCE AUDIT // ISO CGL ENDORSEMENTS
ACORD 25 Subcontractor COI Audit Checklist: Verifying CG 20 10, CG 20 37, CG 24 04 & CG 20 01
An ACORD 25 Certificate of Insurance proves only that policies existed on the issue date; its top disclaimer explicitly states it confers no rights on the certificate holder. Before releasing a monthly draw check, verify active policy dates against the draw period, confirm CGL/Workers' Comp limits, and check for the four mandatory ISO endorsements below.
The 4 Critical ISO CGL Endorsements to Verify
| ISO Code | Endorsement Name | What It Protects | Common Audit Trap |
|---|---|---|---|
| CG 20 10 | Additional Insured — Ongoing Operations | Covers GC and project owner for bodily injury or property damage caused while the subcontractor is actively performing work on site. | Stops covering the GC the moment the subcontractor completes its scope unless paired with CG 20 37. |
| CG 20 37 | Additional Insured — Completed Operations | Extends Additional Insured status after substantial completion for latent defect and post-completion claims. | Frequently omitted by small trade brokers who attach CG 20 10 alone. Older 11/85 editions covered both; modern editions split them. |
| CG 24 04 | Waiver of Transfer of Rights of Recovery (Waiver of Subrogation) | Prevents the subcontractor's CGL insurer from suing the GC or owner to recover claim payouts. | A 'Y' in the SUBR WVD column on ACORD 25 without the actual CG 24 04 endorsement does not bind the carrier. |
| CG 20 01 | Primary and Non-Contributory | Forces the subcontractor's CGL policy to pay first without seeking contribution from the GC's own CGL policy. | Without CG 20 01, insurers often split defense costs pro rata across both policies, spiking the GC's loss history and renewal premiums. |
7-Point Pre-Disbursement ACORD 25 Checklist
1. Insured Legal Name Matches Subcontract & Lien Waiver
Confirm the Named Insured entity (LLC/Inc.) matches the subcontract agreement, AIA G702 applicant, and signed lien waiver claimant—watch for DBA vs. parent-entity mismatches.
2. Policy Effective & Expiration Dates Cover the Draw Through-Date
Verify CGL, Auto, Umbrella, and Workers' Compensation policies are active on both the pay app billing period end date and the check release date. Flag any policy expiring within 15 days.
3. Occurrence vs. Claims-Made Box Checked Correctly
Commercial General Liability must be marked OCCUR (Occurrence), not CLAIMS-MADE. Claims-made CGL policies leave massive tail gaps if the subcontractor drops renewal after project closeout.
4. Per-Project Aggregate Limit Applied (CG 25 03)
Check that the General Aggregate applies per PROJECT (not per POLICY). A single $2M policy-wide aggregate shared across 15 active jobs can be eroded by an unrelated jobsite claim.
5. Workers' Compensation Statutory Limits & Officer Exclusion Check
Confirm Workers' Comp carries statutory limits plus Employers' Liability ($500K/$500K/$500K or $1M standard). Note whether any proprietor/executive officer is excluded.
6. ADDL INSD & SUBR WVD Columns Plus Attached Endorsements
Verify 'Y' marks in the ADDL INSD and SUBR WVD columns and confirm attached CG 20 10, CG 20 37, CG 24 04, and CG 20 01 endorsements naming both the GC and Project Owner.
7. Certificate Holder Block & Jobsite Address Accuracy
Confirm exact GC corporate entity name, project owner entity (where required), and jobsite street address in the Certificate Holder and Description of Operations blocks.
Audit Insurance Inside the Draw Packet—Not Only at Onboarding
Most subcontractor policies run 12-month terms while commercial builds span 18 to 36 months. Checking COIs only at subcontract execution guarantees mid-project policy lapses slip past accounting unless every monthly pay app re-verifies active dates.
Audit ACORD 25 COIs Alongside Every Pay App & Lien Waiver
WaiverAudit inspects the ACORD 25 COI as Layer 2 of every 5-document draw audit—flagging expired policies, missing CG 20 10 / CG 20 37 / CG 24 04 / CG 20 01 endorsements, and low CGL limits right next to your AIA G702 math and statutory lien waiver checks.
Software audit aid only — consult your licensed insurance broker or construction counsel for binding policy review.