Waiver Auditing & Subcontractor Draw Software · AIA G702/G703 · 12 States

Catch Pay App & Lien Waiver Errors in 60 Seconds.

Pre-check AIA G702/G703 math, state-required lien waivers, and COIs before cutting checks or submitting pay apps — eliminating billing holds before draw submission.

Includes your first 3 pay apps free upon signup · No credit card required.

±$0.01 Parity
Penny-accurate pay-app math
12 States
Statutory text & jurats
Auto-Cut PDFs
Splits combined draw packets

Dual-Mode Privacy: ephemeral processing for free/sub scans; encrypted project ledgers for commercial accounts.

Free Pre-Flight Test Audit
No card required

Drop 1 PDF — Combined Packet or Waiver / AIA / COI

Combined PDFs auto-cut & sort during audit · Up to 10 MB

Studio Walkthrough

Inspect Every Draw Package Before Disbursement

Select a workflow below to inspect how WaiverAudit processes single pay apps, batch binders, and statutory exceptions.

VIDEO WALKTHROUGH · /videos/single-draw-defects.mp416:9 HD · 1280x720
STEP 01
Upload Draw Documents
STEP 02
Catch Discrepancies & COI Gaps
STEP 03
Send Correction Email

Upload individual waivers, invoices, and COIs to flag payment shortfalls, date gaps, and missing endorsements—then draft the correction email in one click.

Upload individual waivers, invoices, and COIs to flag payment shortfalls, date gaps, and missing endorsements—then draft the correction email in one click.

Note: Audit processing wait times are accelerated for demonstration.

Workflow

Three Steps From Subcontractor Binder to Clean Draw

STEP 01

Upload Your Draw Packet

Drop single waivers, invoices, AIA G702/G703 sheets, and COIs—or upload a combined multi-sub PDF binder up to 50 MB per document.

STEP 02

Automatic Pay-App Reconciliation

AI document extraction reads every uploaded form—then deterministic parity checks verify Line 8 amounts, Line 7 prior payments, state waiver wording, and sub-tier supplier exposure down to the penny.

STEP 03

Export Compliance Verdict

Review a clear Hold or Approved breakdown and download a stamped PDF Audit Certificate for your lender or project file.

Verification Matrix

5-Document Compliance Parity Engine

Upload a Current Lien Waiver plus any combination of Invoice, AIA G702/G703, Prior Unconditional Waiver, and ACORD 25 COI.

DOC 01 // REQUIRED

Current Statutory Waiver

  • Consideration matches invoice & Line 8 to the cent
  • Mandatory state statutory wording & font rules
  • Notary jurat check (MS § 85-7-433, WY § 29-10-101)
  • Conditional vs. unconditional progress type match
DOC 02 // BILLING

Subcontractor Invoice

  • Net Due reconciled against Waiver & G702 Line 8
  • Retainage percentage math & billing period checked
  • Sub-tier vendor & supply-house extraction (> $5k)
  • Secondary joint-check risk classification
DOC 03 // PAY APP

AIA G702 / G703

  • G703 Col G Grand Total == G702 Line 4 (±$0.01)
  • Change order diagnostic (Line 4 - Col G == Line 2)
  • Line 6 - Line 7 = Line 8 net current payment math
  • Line 7 reconciled against prior unconditional waiver
DOC 04 // PRIOR

Prior Unconditional Waiver

  • Enforces the Two-Waiver Rule for monthly releases
  • Confirms prior cleared funds match G702 Line 7
  • Verifies prior through-date precedes current draw
  • Confirms unconditional release execution & signer
DOC 05 // INSURANCE

ACORD 25 COI

  • Policy effective & expiration dates active at draw date
  • General Liability limits verified against GC thresholds
  • CG 20 10 Additional Insured endorsement check
  • Workers' Comp & Waiver of Subrogation flags

Commercial Draw Controls

AIA G703 Continuation Math & 2nd-Tier Supplier Defense

G703 Schedule of Values Rollup

COL G == LINE 4

Multi-page continuation sheets often carry conflicting subtotal rows. WaiverAudit isolates the terminal cumulative Grand Total and validates it against G702 Line 4 within ±$0.01.

G703 Terminal Col G == G702 Line 4  |  Line 4 - Col G == Line 2
  • Ignores intermediate per-page footers cleanly.
  • Pinpoints unitemized Line 2 change order variances.
  • Separates gross work completed from net earned when retainage is withheld.

Sub-Tier Materialman Defense

THRESHOLD > $5,000

Unpaid supply houses and rental yards create direct 2nd-tier lien exposure even when prime subs sign releases. WaiverAudit surfaces itemized vendors for secondary clearance.

Released (Uncond.)  |  Joint-Check (Cond.)  |  Hold Payment
  • Flags major supply houses and equipment rentals above $5,000.
  • Layer 3 secondary waiver intake per subcontractor draw.
  • Clear tri-state risk status before issuing joint checks.

Security & Custody

Dual-Mode Document Handling

Temporary Audits vs. Project Records

One-off and credit-pack audits automatically clear uploaded files after completion. Commercial project plans store organized draw history in private, encrypted jobsite workspaces.

Stamped PDF Audit Certificates

Completed audits export downloadable PDF reports with a tamper-evident verification stamp and an exact discrepancy breakdown for lender and internal audit files.

Unlimited Named Team Seats

Every company plan supports unlimited project accountants, PMs, and controllers with individual logins, role permissions, and attributable review history.

Transparent Licensing

Division 01, Subcontractor Plans & GC Licensing

Compare all plans & Div 01 passes

Division 01 Per-Project

$149/month
1 Dedicated Project Slot · Single & Batch Draws

Single-jobsite compliance workspace eligible for Owner approval under CSI Division 01.

  • 250 audits per calendar month
  • Single and Batch draws (100 draws per batch)
  • Unlimited authorized team members
  • $0 Permanent Read-Only Vault
Request Division 01 Pass

Subcontractor Plans & Pay As You Go

From $19pay as you go or /month
$19 (1 draw) · $99/mo (20) · $149/mo (50)

Pre-flight draw verification before submitting pay apps and waivers to your GC.

  • 20 audits/mo ($99/mo) or 50 audits/mo ($149/mo)
  • $19 Pay As You Go credit (never expires)
  • Single draws
  • Full 5-document & AIA G702/G703 parity
View Subcontractor Plans

Standard GC

$349/month
4 Active Project Slots · Single & Batch Draws

Built for commercial GCs managing concurrent jobsites and monthly binder uploads.

  • 4 active project slots
  • Unlimited named team members
  • Single and Batch draws (100 draws per batch)
  • 250 audits per included or added slot per quota month
  • AIA G702/G703, waiver and insurance checks
  • Tamper-evident SHA-256 certificates
  • Free read-only project history
Explore GC Plans

Stop approving construction draws on manual spreadsheet checks.

Your first 3 audits run for free in the studio — no credit card required.

Launch Audit Studio