TECHNICAL PLAYBOOKS // COMMERCIAL CONSTRUCTION ACCOUNTING
Draw Verification & Lien Waiver Compliance Guides
Reference documentation for general contractor controllers, project accountants, and construction risk teams covering AIA G702/G703 math, statutory waiver exchanges, ACORD 25 endorsements, and software architecture tradeoffs.
Conditional vs. Unconditional Lien Waivers & The Two-Waiver Rule
Month-by-month draw release mechanics tying AIA G702 Line 8 conditional waivers and Line 7 prior unconditional waivers, plus Georgia 90-day and Mississippi 60-day conversion clocks.
ACORD 25 Subcontractor COI Audit Checklist (CG 20 10, CG 20 37, CG 24 04)
Why the ACORD 25 disclaimer confers no coverage rights on its own, how to verify ISO Additional Insured and Waiver of Subrogation endorsements, and how to catch mid-draw policy lapses.
Pre-Flight Draw Audit Software vs. Payment Portals (GCPay, Textura, Built)
When commercial general contractors need a full subcontractor disbursement portal versus a zero-rip-and-replace pre-flight audit engine that checks PDF packets before funds leave your ERP.
How Commercial GCs Bill Compliance Software Under CSI Division 01
Cost-Plus vs. Lump Sum reimbursement rules, sample prime contract clauses, and FAR Part 31 direct-cost isolation for project-dedicated compliance passes.
50-State Waiver Guide
Look up the 12 statutory states, notary mandates, and 38 common-law rules.
Draw Audit & Statutory FAQ
Answers on AIA G702/G703 math, Two-Waiver Rule, and Dual-Mode Privacy.