Frequently Asked Questions
Everything you need to know about Dual-Mode Document Privacy, server draw ledgers, statutory lien waiver compliance, and commercial pay applications.
Showing 30 questions
·
One audit typically takes between 7 and 25 seconds to complete. Your audit tokens are only deducted once the draw verification is successfully finished.
You can audit up to five core documents (plus secondary supplier waivers) — whether you're a general contractor checking a draw before paying or a subcontractor pre-checking your packet before submitting:
Step 1 (Current Pay App & Waiver):
1. Current Statutory Lien Waiver (Required)
2. Invoice / Billing (Optional)
3. AIA G702/G703 Pay Application (Optional)
4. G703 Continuation Sheet (Optional)
Step 2 (Optional Prior Waiver & Insurance):
5. Prior Unconditional Waiver (Optional — enforces the Two-Waiver Rule and reconciles AIA G702 Line 7)
6. ACORD 25 Certificate of Insurance (COI) (Optional)
Have one combined PDF or ZIP packet? Drop it into the Combined Packet box in Single Draw (or Batch mode) to auto-sort or slice pages into each slot.
In commercial construction accounting, a general contractor rarely collects only one waiver on monthly progress draws. Best-practice draw management requires two waivers:
1. Current Draw Conditional Progress Waiver (for the amount currently billed and pending payment).
2. Previous Draw Unconditional Progress Waiver (confirming that funds from the previous draw cleared the subcontractor's bank account).
WaiverAudit natively audits both waivers in a single draw packet. The engine verifies that the prior unconditional waiver matches AIA G702 Line 7 ("Less Previous Certificates for Payment"), ensuring you never release new funds without proof that last month's funds cleared.
When you upload an AIA G702, WaiverAudit extracts key line items (Line 1 Contract Sum, Line 2 Net Change Orders, Line 4 Work to Date, Line 5 Retainage, Line 6 Total Earned Less Retainage, Line 7 Less Previous Certificates, Line 8 Current Payment Due) and performs multi-way mathematical parity checks:
1. Arithmetic Validation: Line 6 - Line 7 = Line 8.
2. Current Draw Parity: Line 8 (Current Payment Due) equals the Current Lien Waiver amount to the penny, and matches the Subcontractor Invoice Net Due.
3. Two-Waiver Rule Parity: If a Prior Unconditional Waiver is uploaded, the engine cross-references Line 7 (*Less Previous Certificates*) against the prior waiver consideration in either Cumulative mode (matches Line 7) or Discrete Period mode (matches prior draw payment).
If any variance exceeds $0.01, it is flagged as a blocker before payment disbursement.
Commercial continuation sheets (G703 / Schedule of Values) frequently span 5 to 30 pages and render conflicting per-page running subtotals or carried-forward balances. WaiverAudit handles this through a lean, deterministic rollup architecture:
1. Terminal Grand Total Parity: The engine bypasses intermediate page noise and extracts the terminal cumulative Grand Total of Column G (*Total Completed and Stored to Date*). It asserts that Column G Grand Total equals G702 Line 4 within ±$0.01 tolerance.
2. Semantic Header Fallback: If accounting software shifts column letters, our multimodal extractor maps semantic headers ("Total Completed and Stored", "Total Work to Date") directly to Column G.
3. Unitemized Change Orders Diagnostic: If Line 4 minus Column G equals Line 2 Net Change Orders (and Line 2 != 0), the engine flags an informative diagnostic: "Continuation sheet reflects base contract only; Line 2 Net Change Orders unitemized." This alerts your team to an unitemized SOV without causing false panic.
4. Zero-Retainage-Safe Net Earned Diagnostic: If a continuation sheet subtracts retainage per row so Column G matches Line 6 (*Total Earned Less Retainage*), the engine detects this only when Line 5 retainage is greater than zero, suppressing false positives on zero-retainage jobs.
Under mechanics' lien statutes across all 50 states, unpaid second-tier material suppliers and equipment rental houses (e.g., Ferguson, Graybar, Sunbelt Rentals, Vulcan Materials) can record a direct lien against the real property even if the GC paid the subcontractor in full.
WaiverAudit protects general contractors and project owners through an automated 3-step workflow:
1. Automated Vendor Itemization: The engine scans invoices and Schedule of Values line items for material charges and equipment rentals. If itemized material billing exceeds $5,000, it prompts the progressive Sub-Tier Drawer.
2. Progressive Disclosure (Layer 3): You can upload secondary materialman waivers directly within the draw row without cluttering your master view.
3. Tri-State Legal Risk Classification:
• VERIFIED RELEASED: An unconditional waiver matching the itemized material total is on file.
• JOINT-CHECK REQUIRED: A conditional waiver is attached; payment must be issued via two-party joint check to prevent dual liability.
• PAYMENT HOLD ADVISED: Major material billing is detected with NO secondary waiver on file; the system flags an unreleased supplier exposure notice and advises holding payment on that portion until a release is received.
If you upload an ACORD 25 Certificate of Insurance, WaiverAudit instantly verifies:
General Liability limits (e.g., $1M per occurrence / $2M aggregate).
Policy expiration date versus the waiver through-date.
Additional Insured status (CG 20 10 Ongoing Operations).
Completed Operations Additional Insured (CG 20 37).
Waiver of Subrogation (CG 24 04).
Workers' Compensation coverage.
If an endorsement is missing, you get a plain-English explanation of the risk (e.g., "Missing CG 20 37 - if a defect occurs after project completion, this sub's carrier will deny defense coverage to your firm.").
WaiverAudit breaks out Line 5 into 5a (Retainage on Completed Work) and 5b (Retainage on Stored Materials). This lets you see if a subcontractor is holding retainage on materials sitting in a warehouse — a common reason lenders reject draws.
WaiverAudit uses Google Gemini for document data extraction, but the actual compliance decision is made by a deterministic TypeScript rules engine. This means the same extracted data always produces the same compliance result.
Every extracted field comes with a confidence score (0-100). If the score is below 90 on a critical field like AIA Line 8 or retainage, the manual review drawer automatically opens and highlights the uncertain field in amber. You can then type the correct number from the paper document, and the parity check recalculates instantly in your browser.
The manual fallback drawer lets you correct any uncertain numbers manually. The deterministic math check then runs on your corrected input, so you still get a reliable audit.
Yes. Every downloaded audit certificate includes a discreet footer watermark: "Verified by WaiverAudit · www.waiveraudit.com". This gives lenders and title companies a clear, traceable source of origin for the audit document. The watermark is informational only — it does not alter the legal effect of the underlying waiver or pay application.
Batch mode supports 100 draws on Starter, 100 on Standard, 100 on Pro, and 100 on Enterprise. Batches continue processing on the server after submission; staged files waiting for upload require this browser to stay open.
PDFs up to 50 MB (and up to 200 pages per packet) upload directly via Cloudflare R2. In both Single Draw and Batch mode, you can drop a combined PDF or ZIP packet, visually slice page ranges (with optional AI page-split suggestions — files are never stored or used to train AI models), and route each section into its matching document slot.
Documents up to 50 MB upload through Cloudflare R2 for server processing. Temporary files are cleaned up after processing where possible, with expiry cleanup retries. Enterprise completed-audit documents have a 30-day raw-file retention period. Project-backed audits retain structured results and certificate records in the workspace draw ledger. Standalone retry results expire after 24 hours; security, billing and approval records have separate retention.
Standalone results can be retained in your account-scoped browser IndexedDB vault, with temporary server retry records retained separately. Project-backed audits on Starter, Standard, Pro, Enterprise and dedicated passes commit structured results to the workspace draw ledger under project permissions. Retained history can be retrieved in read-only mode after paid access expires. Raw documents follow separate cleanup periods.
WaiverAudit has dedicated statutory engines for California, Texas, Florida, Georgia, Arizona, Nevada, Massachusetts, Michigan, Mississippi, Missouri, Utah, and Wyoming. For all other states, we apply custom logic based on that state's statutory requirements. If you need a state that is not yet covered, contact us.
Yes. If a subcontractor submits an Unconditional Progress or Unconditional Final waiver for a draw that has not yet been paid, WaiverAudit flags it with a warning: "Unconditional waiver submitted for an unpaid draw. This waiver may be voidable for lack of consideration until payment clears."
For commercial AIA draws, WaiverAudit checks that the waiver through-date covers the end of the billing month (e.g., the 28th, 30th, or 31st). If it does not, it is flagged as a lender compliance issue.
Yes. In statutory states like Mississippi (Miss. Code § 85-7-433) and Wyoming (Wyo. Stat. § 29-10-101), an unnotarized lien waiver is statutorily void and unenforceable by law.
WaiverAudit verifies both signature presence and the physical presence of a Notary Public stamp/jurat. If a waiver in Mississippi or Wyoming lacks an authentic notary seal, it is deterministically flagged as a non-compliant failure with statutory code citations.
Every new account starts with 3 complimentary audit credits and zero active project slots.
Use your 3 free credits to test full 5-document draw packets (Invoice, Lien Waiver, AIA G702/G703, Prior Waiver, and ACORD 25 COI) — whether you're a general contractor or subcontractor.
No credit card is required to sign up. Standalone audits consume 1 credit per completed verification.
A Single Draw credit is available for $19 one-time (1 non-expiring single-draw audit), or choose Subcontractor 20 ($99/month for 20 audits/month) or Subcontractor 50 ($149/month for 50 audits/month) — both can be canceled at any time. Every audit checks all 5 commercial documents (Invoice, Waiver, AIA G702/G703, Prior Waiver, ACORD 25 COI) and produces a SHA-256 Draw Compliance Certificate. Batch Draws are reserved strictly for Division 01 Owner-billed Project Passes and GC Company plans (Starter, Standard, Pro, Enterprise).
Starter GC: $149/month or $1,490/year (Cancel at any time), 1 Active Project Slots (+$89/mo per additional project), unlimited named members, Single and Batch draws (100 draws per batch).
Standard GC: $349/month or $3,490/year (Cancel at any time), 4 Active Project Slots (+$69/mo per additional project), unlimited named members, Single and Batch draws (100 draws per batch).
Pro GC: $699/month or $6,990/year (Cancel at any time), 15 Active Project Slots (+$49/mo per additional project), unlimited named members, Single and Batch draws (100 draws per batch).
Enterprise GC: Custom pricing (contact [email protected]), custom active project slots, unlimited named members, Single and Batch draws (custom volume).
Subcontractor Subscriptions (Single draws · Batch draws on Div 01 & GC plans): Subcontractor 20 is $99/month for 20 audits/month ($4.95/audit · Cancel at any time); Subcontractor 50 is $149/month for 50 audits/month ($2.98/audit · Cancel at any time).
Pay As You Go Credit: $19 one-time for 1 non-expiring audit credit (Single draws).
Division 01: $149/month for one project (Cancel at any time) or $1,790 for 24 months ($74.58/month average). Dedicated passes include 250 audits per calendar month and Single and Batch draws (100 draws per batch).
Starter/Standard include 250 audits per included or added slot per quota month; Pro/Enterprise include 500. Company quota is shared across eligible included and added slots. Free signups receive 3 free audit credits. Single and Batch draws are unlocked on Division 01 Owner-billed project passes and GC Company plans. Project-backed history remains read-only after expiration. Owner reimbursement requires project agreement approval; purchasing a pass alone does not authorize reimbursement.
To prevent project slot hopping while keeping pricing fair and transparent, assigning a commercial project to an active slot locks that slot for 30 days. On the monthly billing anniversary, you can swap projects freely or retain the active build. Completed projects can be moved to read-only dormant vaults with zero monthly charge.
Yes. You can cancel automatic renewal in 1 click directly on Billing & Plans (or via the Stripe Billing Portal). You keep full access until your current billing period expires without being billed again, and completed projects transition to your permanent $0 Read-Only Vault afterward. Purchased Audit Pack credits never expire. Lifecycle passes are one-time purchases for 24 months with no automatic renewal; the optional $89/month post-lifecycle extension recurs until cancelled.
After paid access expires, retained project ledger records and tamper-evident certificates remain accessible in read-only mode in your $0 Read-Only Vault without an ongoing subscription fee, subject to the privacy policy and account retention. Non-expiring Audit Pack credits remain available for standalone draws. Raw uploaded documents have separate cleanup periods.
No. WaiverAudit runs entirely in your browser. No downloads, no plugins.
WaiverAudit works on Chrome, Firefox, Safari, and Edge. On Safari/iOS, the PDF extraction worker is bundled locally so it works without cross-origin issues.
Yes. WaiverAudit works seamlessly alongside GCPay, Oracle Textura, Sage, QuickBooks, or any construction accounting workflow via direct PDF and ZIP binder drag-and-drop intake.
Email support is included in all plans. Enterprise plans get priority support with a guaranteed response time.
Still have questions?
Our construction compliance support team is here to assist with enterprise deployments, statutory questions, or custom lender requirements.